A 2 MW & 2MWh PCS & BESS System was Installed on a Cantilever Structures above a Parking Area, with 17 SMA On-Grid Inverters, & 2 4MW Power Stations, all controlled by one customized Advanced EMS That optimizes the energy supply & cost for the University.
A 1.5 MW + 2MWh PCS & BESS System was Installed on the roofs of the Buildings & On a massive 5 meter height structure above the parking, with an Advanced EMS system that controlls a 5 MW power station & 13 SMA ON-GRID inverters.
A 100kW & 300kWh PCS & BESS System was Installed on a nearby Land to Power Up the University on Solar Power,
A 1.2 MWp ON-Grid System was Installed for Beirut International Souks, Resulting in massive drop in the energy bill.
A 250kWp ON-Grid System was Installed on a giant structure above two parking areas, with a 7 meter cantilever arm hanging on a height of 4.5 meters
A 150 kWp ON-GRID System was installed and connected to the local grid of the port of Beirut, resulting in free energy for the facility during the day & excess is being sold to the grid.
A 250 kWp & 600kWh PCS & BESS System is installed and operated to run the factory on solar panels all day long, with no need for diesel generators with a customized advanced Smart EMS controller that is responsible for the integration & Synchronizing with all available utilities.
A 150kW & 300kWh PCS & BESS System was installed to run the palace on solar energy, with a customized advanced Smart EMS controller that is responsible for the integration & nchronizing with all available utilities.
A 400 kWp ON-GRID System was installed and connected to the Beirut Souks Grid to help reduce energy consumption from EDL & Diesel Generators.
A 500kW & 1MWh PCS & BESS System was installed Above a Parking Area with Cantilever Design, to run the whole village on Solar Power, with a customized advanced Smart EMS controller that is responsible for the integration & Synchronizing with all available utilities
A 250 kW & 500kWh PCS & BESS System was installed to run the Building on Solar Energy
A 500 kW & 1MWh PCS & BESS System was installed to Power Up the resort on Solar Energy with a customized advanced Smart EMS controller that is responsible for the integration & Synchronizing with all available utilities, this project made its ROI in 1 year only.
A 110 kWp ON-Grid System was installed and connected to the load to help reduce energy consumption from EDL & Diesel Generators.
130 Houses of Moukhtara were powered by Solar panels & Batteries, the project came after the contribution of Mr. Walid Joumblatt to the village.
A 60 kWp ON-Grid System & 240 kWh Off Grid System were installed to save energy consumption from diesel generators, around 80% of hourie's load comes from Solar Power.
If customers can’t find it, it doesn’t exist. Clearly list and describe the services you offer. Also, be sure to showcase a premium service.
Having a big sale, on-site celebrity, or other event? Be sure to announce it so everybody knows and gets excited about it.
Are your customers raving about you on social media? Share their great stories to help turn potential customers into loyal ones.
Running a holiday sale or weekly special? Definitely promote it here to get customers excited about getting a sweet deal.
Have you opened a new location, redesigned your shop, or added a new product or service? Don't keep it to yourself, let folks know.
Customers have questions, you have answers. Display the most frequently asked questions, so everybody benefits.
Hourie Energy Solutions SAL
1st Floor Sequoia Building, Sami Solh Street, Beirut
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.